Polaris RZR 900 2015 Service Manual page 107

Table of Contents

Advertisement

3. Install the Clutch Center Distance tool (PU-50658-A)
onto the crankshaft and transmission input shaft to
properly position the clutch center distance.
PU-50658–A
HOLE
YEAR
VEHICLE DESCRIPTION
1
2012
2011-14
2
2014-15
2013
2014-16
2015-18
2015-16
3
2013–18
2014–18
2015-18
2014-18
2015-18
4
2016-18
2016–18
5
2015-18
i.e. 2015 RZR 900 uses the holes marked with a 4
9926814 R08 -
Manual
© Copyright Polaris Industries Inc.
RZR 570
RZR 900
RZR XP 1000
RANGER 900
ACE
ACE 570
RGR ETX
RZR 570
RANGER 500/570
RANGER 570 Full-Size
RANGER 900/1000
RZR 900
RZR 1000
ACE 900
RANGER Diesel
2015-2016 RZR 900
ENGINE / COOLING SYSTEM
4. Install the six engine-to-transmission mounting bolts.
Torque bolts in sequence to specification.
TORQUE
Engine-to-Transmission Mounting Bolts
Step 1-2: 64 ft-lb (87 Nm)
Step 3: 5 ft-lb (7 Nm)
Step 4-7: 44 ft-lb (60 Nm)
5. Remove the thin block of wood under the engine
assembly if you placed on there for engine removal.
6. Install the positive and negative cables going to the
starter. Torque fasteners to specification.
TORQUE
Starter Cable Fasteners
30 in-lb (4 Nm)
7. Install the seven bolts retaining the inner clutch cover.
Torque bolts to specification.
TORQUE
Inner Clutch Cover Fasteners
10 ft-lb (14 Nm)
2016 RZR S 1000 Service
3
3.29

Advertisement

Table of Contents
loading

Table of Contents