Preparing for Installation
1C.9.0 PRE-INSTALLATION CHECK LISTS
The following checklists are provided to help the installer during a pre-installation site visit, prior to
installing the generator:
1C.9.1 Site Logistics
Before starting the generator installation, review the following checklist for site logistics.
1C.9.2 Installation Equipment
The following is a checklist of recommended tools and test equipment for installation and calibration of the
generator.
Page 1C-12
Site logistics
Installation equipment
CHECK √ √ √ √
Is there an unloading area to transport the generator from the delivery
truck to the inside of the building?
If the installation is not on the same floor as the delivery entrance, is there
an elevator available?
Are all halls and doorways large enough to allow the generator to pass
through?
Is there a transport dolly or similar device to move the Generator? It must
have a minimum rating of 250 lb. (115 Kg.)
Do any regulatory bodies need to be notified prior to installation?
If movers are required, have arrangements for time and equipment been
completed?
Are lifting straps or some other suitable device available to lift the
generator off the shipping pallet?
CHECK √ √ √ √
General handtools for installation: Wrenches, nut drivers, assortment of
screwdrivers, pliers, etc.
If the generator is to be anchored to the floor, suitable hardware and drills,
drill bits etc must be available.
A supply of connectors for wiring: lugs, caps, line splices etc.
A calibrated DVM which indicates true RMS voltages.
Dual trace memory oscilloscope with a minimum 20 MHz bandwidth;
appropriate leads, probes, etc.
Device for measuring true kVp and mA (mAs). This may be a Dynalyzer
equivalent or a non-invasive system such as the Keithly TRIAD system.
A calibrated radiation meter with detectors that will allow for R/min and uR
type measurements (or uGy and Gy/min).
A strobe or reed type tachometer to verify that the anode is rotating up to
speed.
A sufficient selection of patient absorbers to allow AEC and ABS
calibration. A suggested selection is 3/4 inch Al (quantity 2); 1 mm of Cu
(quantity 8), Water in containers of 5.0. 10.0, 15.0 cm thickness.
Test phantoms to verify the imaging system with the generator.
Rev. D
DESCRIPTION
DESCRIPTION
Indico 100 Series Service Manual
CPI Canada Inc.
Ch # 740895-02