Download Print this page

5.7 Fluoro Setup; 5.8 Tube Calibration; 6.0 Data Link - CPI Indico 100 Series Service And Installation Manual

Hide thumbs Also See for Indico 100 Series:

Advertisement

3C
Programming the Generator
3C.5.7 Fluoro Setup
Refer to chapter 3 section 3E, ABS CALIBRATION.
3C.5.8 Tube Calibration
Refer to chapter 2, the section TUBE AUTO CALIBRATION.
3C.6.0 DATA LINK
This is used with the CPI GenWare utility software. This allows for data communication with a computer
in order to download additional tube types, transfer APR data, run the A
functions. Further documentation is included with the software package in the form of an MS word
document (MANUAL.DOC).
A computer (i.e. laptop) and a 9 pin null modem cable with socket connectors (female) on both
ends are required to run this software and interface to the generator.
Page 3C-20
Rev. B
Millenia / Indico 100 Series Service Manual
CPI Canada Inc.
2
2
 utility, and for other minor
EC
Ch # 740904-05

Advertisement

loading