Download Print this page

CPI Indico 100 Series Service And Installation Manual page 248

Hide thumbs Also See for Indico 100 Series:

Advertisement

6
Regular Maintenance
6.8.2
Tube Conditioning (Procedure) Cont
6.
Season the tube at 120 kV by taking approximately 5 exposures of 160 mA and 100 ms. These
exposures should be taken at the rate of approximately one every 15 seconds.
7.
Restart the auto calibration sequence and allow the auto calibration sequence to complete.
8.
Season the tube at 130 kV by taking approximately 5 exposures of 100 mA and 50 ms. These
exposures should be taken at the rate of approximately one every 15 seconds.
9.
Repeat step 8 at 140 kV, and then at 145 kV.
Page 6-10
Rev. D
Millenia / Indico 100 Series Service Manual
CPI Canada Inc
Ch # 740904-10

Advertisement

loading