Nortel DMS-100 Series Maintenance Manual page 86

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

1-70 Maintenance overview
.SREX system dependencies
IPL
Register
LCM
SREX database
LCM objects
The converter voltage and ring test portions of LCM_REX_TEST require
wait states and different test resources. These states and resources cause
delays in SREX main task performance that are not acceptable.
LCMCOV_REX_TEST, running at a lower priority, starts these tests
separate from the LCM_REX_TEST. LCMCOV_REX_TEST requires
logical test unit (LTU) connections in the maintenance line card. An LCM
unit can access the single LTU when the other unit is OOS. This resource
limit precludes concurrent LCMCOV_REX_TEST performance. The entry
of the PARALLEL performance field for LCMCOV_REX_TEST, in Table
REXSCHED, allows a maximum of one.
297-8211-550 Standard 05.01 August 1999
LCM REX
LCM
SREX
Aspect
Gates
SREX controller
Table OFCVAR
NODEREXCONTROL
LCM TC
LCM
Objects
Table REXSCHED
LCM_REX_TEST
LCMMTC
LCM CI
Manual
TST REX

Advertisement

Table of Contents
loading

Table of Contents