Nortel DMS-100 Series Maintenance Manual page 570

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

8-204 Card replacement procedures
NTRX42
MSP
(continued)
At the MAP terminal
24
25
26
27
At the MAP display
28
297-8211-550 Standard 05.01 August 1999
Load the LCM unit by typing
>LOADPM UNIT lcm_unit_no CC
and pressing the Enter key.
where
lcm_unit_no
is the number of the LCM unit to loaded (0 or 1)
If
message "loadfile not
found in directory" is not
received
load passes
load fails
Determine the type of device on which the PM load files are located.
If load files are located on
tape
IOC disk
SLM disk
Locate the tape that contains the PM load files.
Mount the tape on a magnetic tape drive.
Download the tape by typing
>MOUNT tape_no
and pressing the Enter key.
where
tape_no
is the number of the tape drive containing the PM load files
Do
step 25
step 42
step 70
Do
step 49
step 55
step 60

Advertisement

Table of Contents
loading

Table of Contents