Nortel DMS-100 Series Maintenance Manual page 653

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

5
To open battery string pairs 0 (strings 0 and 4) and 1 (strings 1 and 5), perform
the following steps:
a.
Type
>OPENCKT 0
and press the Enter key.
where
0
is the number of battery string 0 and 4
b.
Type
>OPENCKT 1
and press the Enter key.
where
1
is the number of battery string pair 1 and 5
Example of a MAP display
CM
MS
IOD
.
.
.
PES
0 Quit
PM
2 Post_
3
4
PES
5
6 Tst_
PES
7 Bsy_
8 Rts_
Common
9 OffL_
AC
10
11 Disp_
BCC
12 Next
0= W
13
1= W
14 QueryPES
15 OpenCkt_
16 Charge_
17 LoadB_
18 MEASure_
6
Allow a six hour wait time to allow the battery to equalize before you proceed to
the next step.
DMS-100 Family OPAC Maintenance Manual XPM12 and up
Routine maintenance procedures 13-5
NET
PM
CCS
.
1PES
.
SysB
ManB
0
3
RED
AMBER
0
1
2 Cond:
RED
Rectifiers
FL0 FL1 CL0 CL1
.
.
.
.
.
0
1
2
3
O/C
O/C
.
.
O/C
O/C
.
.
Indicates the open circuited
string pairs.
Battery capacity test
OPAC
LNS
Trks
Ext
.
.
OffL
CBSY
ISTB
4
0
4
GREEN
OFFL
6
0
REM2
2
1
RMM
Audit
Week
DIS
BCCDVR
PESALRM
ECU FSP
.
.
.
Temp
Door
BCCFUSES
EHT ELT
FRNT SIDE
.
.
.
.
(continued)
Appl
.
.
InSV
30
2
HBT
.
.
.
0
1
.
.

Advertisement

Table of Contents
loading

Table of Contents