Nortel DMS-100 Series Maintenance Manual page 467

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

At the MAP terminal:
17
Test the links busied in step 14 by typing
>TST LINK link_no
and pressing the Enter key.
where
link_no
is one of two links associated with the replacement card
Repeat this entry for the other link associated with the replacement card.
If test
failed
passed
18
Return to service the links busied in step 14 by typing
>RTS LINK link_no
and pressing the Enter key.
where
link_no
is one of two links associated with the replacement card
Repeat this entry for the other link associated with the replacement card.
If RTS
failed
passed
19
Determine if there are remaining links to clear.
If there are
remaining links to clear
no remaining links to clear
20
If you were directed to this procedure from the Alarm Clearing Procedures ,
return now to the alarm clearing procedure that directed you here. Otherwise,
continue with step 21.
DMS-100 Family OPAC Maintenance Manual XPM12 and up
Card replacement procedures 8-101
HIE
Do
step 25
step 18
Do
step 25
step 19
Do
step 9
step 20
NT6X50
(continued)

Advertisement

Table of Contents
loading

Table of Contents