9
To test the ManB link, type
>TST LINK link_no
and press the Enter key.
where
link_no
is the number of the link (0 or 1) manually busied in step 8
If test
passes
fails
10
To return the link to service, type
>RTS LINK link_no
and press the Enter key.
where
link_no
is the number of the link (0 or 1) tested in step 9
If RTS
passes
fails
11
Determine if you must clear additional links.
If you
cleared all the links that had faults
did not clear all the links
12
To post the RMM, type
>POST RMM rmm_no
and press the Enter key.
where
rmm_no
is the number of the RMM to be posted
DMS-100 Family OPAC Maintenance Manual XPM12 and up
Alarm clearing procedures 7-103
minor
(continued)
Do
step 10
step 16
Do
step 11
step 16
Do
step 12
step 8
RMM