Nortel DMS-100 Series Maintenance Manual page 487

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

8
Power up the NT6X53 converter just inserted.
Determine the correct MSP switch for the shelf in which the power converter
was replaced from the diagram below. The switches are numbered
corresponding to the shelf position.
Circuit breaker
CB1
CB3
Turn the circuit breaker on for the unit with the new power converter.
The converter fail LED on the converter will be extinguished.
The frame fail lamp on the converter will be extinguished.
9
If you were directed to this procedure from the Alarm Clearing Procedure return
now to the alarm clearing procedure that directed you here. Otherwise,
continue with step 10.
At the MAP terminal
10
Load the LCM unit by typing
>LOADPM UNIT lcm_unit
and pressing the Enter key.
where
lcm_unit
is the LCM unit to be loaded (0 or 1)
If
message loadfile not found in
directory is received
load passed
load failed
Unit FED
LCA 0
LCA 1
DMS-100 Family OPAC Maintenance Manual XPM12 and up
Card replacement procedures 8-121
LCM
Locations
Bay 0 slot 19–02
Bay 0 slot 32–02
Do
step11
step28
step 31
NT6X53
(continued)