Nortel DMS-100 Series Maintenance Manual page 145

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

Cycle rotation for week 2
Week
Sunday
Charge cycle
If the string voltage meets the bus minimum requirements you can put a
string on the charge bus. The charge cycle begins with a measurement of
battery string voltages. The charge cycle consists of the following steps:
1 At OPM_CHARGE_START_TIME, the battery pair to be charged is
2 If the pair passes the minimum voltage test, the system moves the pair to
3 When the charge period is over, the pair is open-circuited.
4 At OPM_CHARGE_START_TIME the next day, the system moves the
Rotation disabled mode
Use the command string AUDIT DISABLE to disable the OPAC battery
rotation and test software from the PES MAP level.
This command string halts battery rotation, charges, and test activities. This
command string does not halt the hardware audit that runs every hour.
(continued)
Monday
Tuesday
TST DIS
TST
1
CHG 1
CHG
LDB
ST1
ST1
O/C ST2
TST MIN
2
CHG
ST2
open-circuited. The system measures and tests pair voltages against the
OPM_MIN_CHG_VOLT value. If one string voltage does not meet the
minimum voltage required, the system leaves the pair on the load bus.
The charge cycle for that day is bypassed, and the system generates a
PES115 log.
the charge bus for OPM_CHARGE_DURATION.
pair to the load bus. The charge cycle for the next battery string pair
begins.
DMS-100 Family OPAC Maintenance Manual XPM12 and up
OPAC maintenance overview 2-51
Wednesday
Thursday
LDB ST2
LDB ST3
O/C ST3
O/C ST0
TST MIN 3
TST MIN 0
CHG ST3
CHG ST0
—end—
Friday
Saturday
LDB
LDB ST1
ST0
O/C
ST1
TST
MIN1
CHG
ST1

Advertisement

Table of Contents
loading

Table of Contents