2-50 OPAC maintenance overview
7 When the charge period is complete, the pair is open-circuited.
8 At OPM_CHARGE_START_TIME on Tuesday, the system measures
Note 1: When a system software marks a battery string pair as failed, follow
the test procedures listed in "Manual test procedures for system-failed
battery strings"in this document.
Note 2: After a battery string pair that failed system testing is replaced or
passes manual tests, return the battery string pair to service. Use the BSY
and RTS commands to return the pair to service.
The following table describes the rotation cycle for week 2. The table uses
the default start time of 11 p.m. (23:00) and the default discharge time of 60
minutes. The legend for the table is:
Cycle rotation for week 2
Week
Sunday
22:00
MEAS
ALL
2
O/C
ST1
297-8211-550 Standard 05.01 August 1999
and tests the voltage against OPM_VOLT_TST_CHG. If the voltage
fails the test, the system marks the string as failed. The system returns
the pair to the load bus and the charge cycle for the next string begins.
O/C is open circuit
STn is battery string pair
CHG is charge bus
DISCHG is discharge through NT8X02 card
MEAS is measure voltage
LDB is load bus
TST is test
Monday
Tuesday
6:00
O/C
ST1
22:00
TST
OCC 1
DCHG
ST1
23:00
23:00
Wednesday
Thursday
6:00
6:00
O/C ST2
O/C ST3
23:00
23:00
—continued—
Friday
Saturday
6:00
6:00
O/C
O/C ST1
ST0
23:00
23:00

Advertisement

Table of Contents
loading

Table of Contents