7-128 Alarm clearing procedures
ESA
critical, minor
(continued)
14
15
16
297-8211-550 Standard 05.01 August 1999
To test the ESA processor, type
>TST
and press the Enter key.
If test
passes
fails because of loading error
fails, and the system produces card
list
fails, but the system does not
produce card list
To return the ESA processor to service, type
>RTS
and press the Enter key.
If return to service
is successful
fails because of loading error
fails because of CBsy condition
other than listed here
To reload the ESA processor, type
>LOADPM
and press the Enter key.
If load
is successful
is not successful
Do
step 15
step 16
step 17
step 19
Do
step 20
step 16
step 4
step 19
Do
step 14
step 19

Advertisement

Table of Contents
loading