Case 580SR Service Manual page 484

Hide thumbs Also See for 580SR:
Table of Contents

Advertisement

www.maskinisten.net
132
Screw the ring nut (10) in, using the wrench
380003218 for ring nut and for pinion retainer.
S
WARNING
The torque setting is given by the preloading meas-
urement on bearings; tighten the ring nut (10) grad-
ually.
NOTE: if the tightening is excessive, the collapsible
spacer must be replaced and the procedure repeat-
ed. When you check the preloading, it is advisable
to beat slightly both pinion ends with a soft hammer,
so as to help setting the bearings.
Carry out the preloading measurement P of the pin-
ion taper roller bearings, using a dynamometer
whose cord is wound on the end of pinion spline.
The adjustment is carried out by increasing the ring
nut torque gradually, being careful not to exceed.
S
WARNING
All preloadings must be measured without the seal
ring.
Once the requested preloading value is achieved,
stake the ring nut, using a hammer and a chisel.
SECTION 25 - FRONT AXLES
P = 9.2÷13.7 daN
Copyright ©
10
F27445
F27432
F27338

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

580sr+590sr695sr

Table of Contents