Run In Period Of A New Machine - New Holland B95C Original Instructions Manual

Tractor loader backhoe, tier 4b
Hide thumbs Also See for B95C:
Table of Contents

Advertisement

Run in period of a new machine

During the first 20 h of operation (new machine or after an engine rebuild), make sure that you:
• Operate the machine with normal loads for the first 8 h.
• Do not work the engine hard at stall speeds (wheels slowly turning or stopped and the engine running at full throttle).
• Keep the engine at normal operating temperature.
• Do not run the engine at idle speeds for long periods of time.
• Operating the machine at low idle for prolonged periods, increases the frequency of the Selective Catalyst Reduc-
tion (SCR) cleaning process (hydrocarbon management).
• Perform the maintenance procedures listed in the maintenance chart: "Initial 10 hours", "Every 10 hours or daily",
and the "Initial 20 hours". If any abnormalities are found contact your NEW HOLLAND CONSTRUCTION dealer
immediately.
After the first 50 operating hours
After the first 50 operating hours, consult your NEW HOLLAND CONSTRUCTION dealer for the 50 h maintenance
interval.
4 - OPERATING INSTRUCTIONS
4-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

B95c tcB110c

Table of Contents