Loader Bucket Installation - New Holland B95C Original Instructions Manual

Tractor loader backhoe, tier 4b
Hide thumbs Also See for B95C:
Table of Contents

Advertisement

Loader bucket Installation

B95C - B95CLR - B110C
1.
Make sure all bushings are completely clean. Re-
move any dirt or foreign matter, if necessary.
2.
Start the engine.
3.
Use the attachment controls to engage the attach-
ment between the bucket lugs.
4.
Install the arm/bucket pins (1) and then install the
relevant retaining bolts.
5.
Use the bucket controls to align the connecting rod
orifices with the bucket lugs.
6.
Stop the engine and remove the starter switch key.
7.
(4x1 bucket) release the pressure from the bucket
circuit.
8.
Install the rod/bucket pins (2), and then install the
relevant retaining bolts.
9.
(4x1 bucket) remove the plugs and reconnect the hy-
draulic lines.
B95CTC
1.
Make sure all bushings are completely clean. Re-
move any dirt or foreign matter, if necessary.
2.
Start the engine.
3.
Use the attachment controls to engage the attach-
ment between the bucket lugs.
4.
Reinstall the arm/bucket pins (1) and then install the
relevant retaining pins and rings.
5.
Use the bucket controls to align the connecting rod
holes (3) with the bucket lugs.
6.
Stop the engine and remove the starter switch key.
7.
(4x1 bucket) release the pressure from the bucket
circuit.
8.
Install the rod/bucket pins (2) and then install the rel-
evant retaining pins and rings.
9.
(4x1 bucket) remove the plugs and reconnect the hy-
draulic lines.
6 - WORKING OPERATIONS
6-22
1
MOLI12LBB0268AB
2
MOLI12LBB0271AB

Advertisement

Table of Contents
loading

This manual is also suitable for:

B95c tcB110c

Table of Contents