GBC FusionPunch II Service Manual page 49

With stacker and bypass
Hide thumbs Also See for FusionPunch II:
Table of Contents

Advertisement

18. With all interlocks closed, on the Stacker
AC/DC Distribution PWB, check continuity
between P/J 16B-24V and P/J 16B-24VI
(Top Cover Interlock).
The continuity check is good.
Y
N
Replace the harness (PL 6.2A).
Go to Step 19.
19. Ensure all other interlocks are closed.
Using the information in the table below,
check the harness between P/J 20 and P/J
19 on the Stacker I/O PWB.
Interlock
P/J 20 Pin
Top Cover
0V
Front Door
0V
The continuity check is good.
Y
N
Replace the harness (PL 6.2A).
Replace the Daughter PWB (PL 3.1). If the
problem is still present, replace the Stacker
I/O PWB (PL 3.2).
GBC FusionPunch II Service Manual
P/J 19 Pin
INA6
INB1
12/2003
2-25
RAP 3.2 Stacker Interlock Switches

Advertisement

Table of Contents
loading

Table of Contents