GBC FusionPunch II Service Manual page 112

With stacker and bypass
Hide thumbs Also See for FusionPunch II:
Table of Contents

Advertisement

REP 4.9 Document Transport
Motor
Parts List: 1.1 B
WARNING
Switch off the Main Power.
Disconnect the power cord.
Removal
1. Remove the Punch Rear Panels.
2. Loosen the Allen Head Cap screw on the
Document Transport Timing Belt Take Up
Assembly.
3. Remove the Document Transport Timing
Belt.
4. Remove the 2 screws holding the shielding
plate over the cable connectors for the
Document Transport Motor Cable
Assembly.
5. Record the location of the wires and then
remove the connectors from the Document
Transport Motor.
6. Remove the 4 Carriage screws, the 4 Hex
Nuts and the 8 Washers holding the
Document Transport Motor.
7. Remove the Punch Motor Pulley from the
old Punch Motor and install it on the new
Punch Motor.
Replacement
1. Reinstall the parts in reverse order.
2. Perform ADJ 4.1 Document Transport
Timing Belt Tension before turning on the
machine.
REP 4.9 Document Transport Motor
NOTE: Make sure that the Document Transport Motor Cable Assembly is being installed
as recorded in Step 5 in the removal procedure.
12/2003
4-16
Figure 1.
GBC FusionPunch II Service Manual

Advertisement

Table of Contents
loading

Table of Contents