Installing a Single Offset Stacker
1. Complete the installation and alignment of the Punch before
attempting this procedure.
2. Like attaching the punch to the printer, the stacker is attached to the
punch by aligning the male docking pins on the stacker docking
assembly with the female docking assembly on the punch. The
punch also has two locating pins on the top right of the assembly,
which are also used to align the stacker with the punch. Move the
Stacker into position, close enough to the punch to adjust the position
of the locating pins on the punch with the holes in the stacker frame
(Figure 8-5).
.
Holes for
Punch
Locating Pins
3/16 in. Allen
Head Cap
Screws
Docking Pins
Figure 1-70 Stacker Docking Pins and Holes.
3. Open the front door of the stacker and loosen, but do not remove, the
four 3/16 inch Allen head cap screws that hold the docking assembly.
Installation
4. If it appears that the stacker is not already aligned with the punch in
the front-to-rear direction, on the left side of the stacker (outside),
loosen two 3/16 inch Allen head cap screws that also hold the
docking assembly.
5. Remove the rear cover from the stacker to access the left rear and
right rear caster adjustment bolts.
6. Using a 1/2 inch wrench, adjust the left front and left rear caster bolts
to align the top front and top rear locating pins on the punch with the
holes in the stacker frame.
7. Perform a rough visual leveling of the stacker by using a 1/2 inch
wrench to adjust the front and rear casters on the right side of the
stacker.
8. Move the stacker to adjust the front to rear alignment of the locating
Stacker Left
pins on the punch and the holes in the stacker frame.
Side View
9. Adjust the front to rear alignment of the docking assembly and tighten
the two 3/16 inch Allen head cap screws on the left side of the
stacker.
10. Move the stacker to the docking position. Using a 1/2 wrench, try the
docking latch. When correctly positioned, the docking latch should
provide a noticeable resistance to being latched.
11. If the docking latch tension is correct, tighten the remaining four 3/16
Docking
inch Allen head cap screws that hold the docking assembly. If the
Latch Bolt
docking latch tension is not correct, move the docking assembly to
the left or right before tightening the remaining four screws.
12. On the right side of the stacker, lower the front and rear leveling pads
until they are touching the floor. Using the 1/2 inch wrench, screw the
right front and right rear casters up so that the weight of the stacker is
resting on the leveling pads.
13. Check the left-to-right and front-to-back leveling of the stacker with a
level. Make any fine adjustment to the leveling of the stacker by
adjusting the leveling pads.
14. Locate the I/O cables and the stacker power cable on the rear floor of
the punch. Pass these cables through the knockouts between the
stacker and the punch so that the cables can be connected to the
appropriate Stacker PWBs.