GBC FusionPunch II Service Manual page 428

With stacker and bypass
Hide thumbs Also See for FusionPunch II:
Table of Contents

Advertisement

7. If your system has a GBC FP II Bypass Stacker unit configured in it, then go to Step 8 of this installation procedure.
If your system only has a GBC FP II Stacker unit configured without a Bypass, then go to Step 12 of this installation procedure.
8. Replace the Stacker Bypass Motor Pulley. (Figure 8-24)
8.1 Remove the Stacker Rear Panel.
8.2 Remove the Bypass Pulley Top Cover (4 Allen Head Cap screws and 4 Lock Washers) and the Bypass Pulley Bottom Cover (2 Allen Head Cap
Screws and 2 Lock Washers) (Figure 8-24).
8.3 Loosen the 4 Hex Nuts holding the Bypass Motor (Figure 8-24).
8.4 Remove the Bypass Motor Timing Belt (Figure 8-24).
8.5 Install the new Stacker Bypass Motor Pulley (7610534) and leave the Stacker Bypass Motor Timing Belt for now, go to Step 9.
Installation Procedure
BYPASS MOTOR TIMING BELT
HEX NUTS (4)
BYPASS
MOTOR
PULLEY
Figure 1-89 Replacing the Stacker Bypass Motor Pulley
12/2003
ALLEN HEAD CAP SCREWS (4)
LOCK WASHERS (4)
8-26
GBC FusionPunch II Service Manual

Advertisement

Table of Contents
loading

Table of Contents