GBC FusionPunch II Service Manual page 35

With stacker and bypass
Hide thumbs Also See for FusionPunch II:
Table of Contents

Advertisement

The voltage is +23.5 VDC to +25.5 VDC.
Y
N
Replace the Punch AC/DC
Distribution PWB (PL 3.1).
On the Stacker AC/DC Distribution PWB,
check for +24 VDC between P/J 14-24V
and P/J 14-0V.
The voltage is +23.5 VDC to +25.5 VDC.
Y
N
Replace the harness between the
Punch AC/DC Distribution PWB P/J
14 and the Stacker AC/DC
Distribution PWB P/J 14 (PL 6.1B).
The +24 VDC Power Circuit are OK.
GBC FusionPunch II Service Manual
12/2003
2-11
RAP 1.4 Punch +24VDC Power

Advertisement

Table of Contents
loading

Table of Contents