GBC FusionPunch II Service Manual page 429

With stacker and bypass
Hide thumbs Also See for FusionPunch II:
Table of Contents

Advertisement

9. Remove the Stacker Bypass Assy. perform REP 5.2 (Bypass Assy. Removal) in the GBC FP II Service Manual.
10. Remove and replace the Bypass Stacker Main Drive Pulley with the new Pulley (7610535) from the Kit.
11. Replace the Stacker Bypass Assy., the Stacker Bypass Timing Belt, tighten the Stacker Bypass Motor, and install the Stacker Bypass Pulley
Covers.
12. Connect the main Power Cord to the Punch Unit and Power the Punch ON.
13. Go to the Control Panel and enter the Service Diagnostics.
14. Keep pressing the Diagnostics button until you get the Printer Select Function and the use the arrows to scroll to desired printer to be connected to.
15. Exit the Service Diagnostics.
16. Follow the normal installation procedure to complete the installation and training.
12/2003
GBC FusionPunch II Service Manual
Installation Procedure
8-27

Advertisement

Table of Contents
loading

Table of Contents