GBC FusionPunch II Service Manual page 425

With stacker and bypass
Hide thumbs Also See for FusionPunch II:
Table of Contents

Advertisement

4. Remove and replace the Document Transport Timing Belt, the Take Up Assembly, and the 2 Main Drive Pulleys. (Figure 8-21)
4.1 Remove the Take Up Assy. to loosen the Document Transport Timing Belt and remove both the Belt and the Take Up Assy.
4.2 Remove the 2 Main Drive Pulleys, by loosening both Set Screws on each Pulley.
4.3 Install the 2 new Drive Pulleys (7610532) from the Kit.
4.4 Install the new Document Transport Timing Belt (7610533) and mount the new Take Up Assy. (7610537) using the hardware from the original
Take Up Assy. Refer to section 4 of the FP II Service Manual for Belt Tension adjustments, if needed.
Main Drive Pulleys
GBC FusionPunch II Service Manual
Document Transport Timing Belt
Figure 1-86 Replacing the Document Transport Main Drive Assy.
12/2003
8-23
Take Up Assy.
Installation Procedure

Advertisement

Table of Contents
loading

Table of Contents