8. Open the front left door of the punch and loosen, but do not remove,
the four 3/16 inch Allen head cap screws that hold the docking
assembly (Figure 8-3).
3/16 in. Allen Head Cap
Screws
Figure 1-68 Docking Latch.
9. On the left side of the punch (outside), loosen but do not remove two
3/16 inch Allen head cap screws that also hold the docking assembly.
10. Adjust the front-to-rear alignment of the punch docking assembly with
the printer docking assembly and tighten the two 3/16 inch Allen head
cap screws on the left side of the punch.
11. Move the punch to the docking position. Try the docking latch. When
correctly positioned, the docking latch should provide a noticeable
resistance to being latched.
12. If the docking latch tension is correct, tighten the remaining four 3/16
inch Allen head cap screws that hold the docking assembly. If the
docking latch tension is not correct, adjust the docking assembly by
moving it to the left or right, before tightening the remaining four Allen
head cap screws.
GBC FusionPunch II Service Manual
Docking Latch
13. On the right side of the punch, lower the front and rear leveling pads
until they are touching the floor. Screw the right front and right rear
casters up so that the weight of the punch is resting on the leveling
pads.
14. Check the left-to-right and front-to-back leveling of the punch with a
level. Make any fine adjustment to the leveling of the punch by
adjusting the leveling pads.
15. Connect the DFA Cable from the Host Printer to the FusionPunch II
(Figure 8-4).
Note: If the DFA Cable is not visible, open the back panel of the bypass
transport and the door to locate the DFA Cable
.
Figure 1-69 DFA Cable from the Host Printer to the FusionPunch II
16. Complete the installation of the Stacker before connecting the punch
power cable.
12/2003
8-5
Installation