Bypass Kit Installation procedure
WARNING
Switch off the Main Power.
Disconnect the power cord.
1. Remove the Stacker Rear Panel and open the Stacker Top Cover.
2. Remove and replace the Stacker Infeed Assy. with the Bypass
Stacker Wire Form Assy. (Figure 8-7)
2.1 Remove the 4 Allen Head Cap screws, 4 Flat Washers, 4 Lock
Washers and the Stacker Infeed Assy (Figure 8-7).
2.2 Install the Bypass Stacker Wire Form Assy., ensure to align the
Wire Form Guides to the side of the each associated tapper.(You
may have to move the tappers over so that they do not interfere
with the Wire Form Guides.)..
STACKER INFEED ASSY
Figure 1-72 Stacker Infeed Assy removal
GBC FusionPunch II Service Manual
BYPASS STACKER WIRE
FORM ASSY
12/2003
8-13
3. Mount the RH and LH Docking Brackets and the Docking Bar (Figure
8-8).
3.1 Mount the RH and LH Docking Brackets using 2 Lock Washers
and 2 Hex Nuts on each Bracket; fingertighten the Hex Nuts.
3.2 Mount the Docking Bar using 4 Lock Washers and 4 Hex Nuts
tighten the Hex Nuts firmly.
RH
LH DOCKING
DOCKING
BRACKET
BRACKET
Figure 1-73 Mounting the Docking Brackets
DOCKING BAR
Bypass Kit Installation procedure