T-Trx Box Replacement Procedure - GE Venue R1 Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
8-5-4

T-TRx Box Replacement Procedure

CAUTION
8-5-4-1
Tools
Appropriate Phillips screwdriver.
FRU Part #
Table 9-12
Refer to
8-5-4-2
Time Required
15 minutes
8-5-4-3
Preparations
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-5-4-4
T-TRx Box Removal Procedure
1.) Remove all accessories.
2.) Remove the following covers: RS Probe Cover, Lower Front eTower, Left side eTower, and Right
Side eTower.
3.) Open the two fastening latches on the left side of the FE door assembly and loosen the captive
screw. Then, carefully open the door.
4.) Disconnect the MPB TO T-FEPS Cable.
5.) Disconnect the fan cable.
6
EVISION
When performing these procedures, take precautions to avoid damage of
electrostatic-sensitive components. Always have the ESD wrist strap
connected either to the DIB chassis or to the GND plug at the rear of the
scanner, and to your hand.
.
on page 9-12
Accessories - Replacement Procedures
RS Probe Cover Installation Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
Chapter 8 - Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
M
ERVICE
ANUAL
8-73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents