Cables - Replacement Procedures; Mpb Rear Usb Cable Replacement Procedure - GE Venue R1 Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
Section 8-7

Cables - Replacement Procedures

8-7-1

MPB Rear USB Cable Replacement Procedure

8-7-1-1
Tools
Appropriate Phillips screwdriver.
FRU Part #
Refer to
8-7-1-2
Time Required
10 min
8-7-1-3
Preparations
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-7-1-4
MPB Rear USB Cable Removal Procedure
1.) Remove all accessories.
2.) Remove the following covers: Lower Front eTower, Left side eTower, and Right Side eTower,
3) Remove MPB Front Metal Door.
4.) Remove the battery packs to gain access to the MPB module.
5.) Remove the PSU module.
6.) Unscrew the two mounting screws and remove the MPB module.
8-108
6
EVISION
Table 9-14
.
on page 9-14
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
MPB Front Metal Door Removal Procedure
Battery Module Removal Procedure
PSU Module Removal Procedure
MPB Module Removal Procedure
Section 8-6 - Mechanical Parts- Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents