P R E L I M I N A R Y
D
5771498-100, R
IRECTION
8-7-6
ON/OFF Switch Cable Replacement Procedure
8-7-6-1
Tools
Flat screwdriver.
FRU Part #
Table 9-14
Refer to
8-7-6-2
Time Required
10 min
8-7-6-3
Preparations
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-7-6-4
ON/OFF Switch Cable Removal Procedure
1.) Remove all accessories.
•
2.) Remove the following covers: Lower Front eTower, Left side eTower, and Right Side eTower,
•
•
•
•
3.) Remove the battery packs to gain access to the MPB module.
•
4.) Unscrew the two mounting screws and remove the MPB module.
6
EVISION
.
on page 9-14
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
Battery Module Removal Procedure
Figure 8-141 Accessing ON/OFF Switch Cable
Chapter 8 - Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
ON/OFF Switch Cable
M
ERVICE
ANUAL
8-139