T-Cfe (Cfront End) Module Replacement Procedure - GE Venue R1 Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
8-4-11

T-CFE (cFront End) Module Replacement Procedure

CAUTION
8-4-11-1
Tools
Appropriate Phillips screwdriver.
FRU Part #
Refer to
8-4-11-2
Time Required
15 minutes
8-4-11-3
Preparation
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-4-11-4
T-CFE Module Removal Procedure
1) Remove all accessories.
2) Remove the following covers: RS Probe Cover, Lower Front eTower, Left side eTower, and Right
Side eTower.
3.) Open and remove the full Front End door assembly and place it on a stable surface:
4.) Remove the T-FEPS module.
8-60
6
EVISION
When performing these procedures, take precautions to avoid damage of
electrostatic-sensitive components. Always have the ESD wrist strap
connected either to the DIB chassis or to the GND plug at the rear of the
scanner, and to your hand.
Table 9-12
.
on page 9-12
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
Full Front End Removal
Front End Power Supply Removal Procedure
Section 8-4 - System Modules- Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents