Electrical Tests - GE Venue R1 Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
4-3-11

Electrical Tests

4-3-11-1
Ground Continuity Test
1.) Using multimeter, ensure there is a ground continuity between the ground prong of the IPP power
connector and the arm ground cable connection.
IPP Power Connector
6
EVISION
Ground prong
Figure 4-17 Ground Continuity test
Chapter 4 - General Procedures and Functional Checks
V
™ S
ENUE
ERVICE
System back
M
ANUAL
4-29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents