PSU to MPB DC Docking Cable Replacement Procedure

8-7-4-1
Tools
Appropriate Phillips screwdriver
Flat screwdriver.
FRU Part #
Table 9-14
Refer to
8-7-4-2
Time Required
15 min
8-7-4-3
Preparations
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-7-4-4
PSU to MPB DC Docking Cable Removal Procedure
1.) Remove all accessories.
2.) Remove the MPB module.
3.) Remove the fan.
4.) Disconnect J8 to lower PSU connectors (see connectors' diagram below):
6
EVISION
.
on page 9-14
Accessories - Replacement Procedures
MPB Module Removal Procedure
MPB Blower (Fan) Removal Procedure
Figure 8-134 Connectors Diagram
Chapter 8 - Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
M
ERVICE
ANUAL
8-133

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents