GE Venue R1 Service Manual page 358

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
8-7-5-5
MPB TO BE PWR Cable Installation Procedure
1.) Connect the cable using the two plastic cable clips
2.) Connect the two lower cable connectors by sliding them downwards
3.) Install the MPB module.
4) Install the MPB Front Metal Door.
5.) Refit the following covers: MPB Door Cover, Left and Right Side eTower Covers, Lower Front
eTower Cover, and RS Probe cover
6.) Install all accessories.
7.) Turn ON power to the system.
Perform the checks listed in
8-138
6
EVISION
MPB Module Installation Procedure
MPB Front Metal Door Installation Procedure
MPB Door Cover Installation Procedure
Left Side eTower Cover Installation Procedure
Right Side eTower Cover Installation Procedure
Lower Front eTower Cover Installation Procedure
RS Probe Cover Installation Procedure
Accessories - Replacement Procedures
Section 8-6 - Mechanical Parts- Replacement Procedures
MPB to BIB Control Cable Replacement Procedure
V
™ S
M
ENUE
ERVICE
ANUAL
on page 8-218

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents