P R E L I M I N A R Y
D
5771498-100, R
IRECTION
8-6-8
MPB Blower (Fan) Replacement Procedure
8-6-8-1
Tools
Appropriate Phillips screwdriver
FRU Part #
Refer to
8-6-8-2
Time Required
10 min
8-6-8-3
Preparations
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-6-8-4
MPB Blower (Fan) Removal Procedure
1.) Remove all accessories.
•
2.) Remove the following covers: Lower Front eTower, Left side eTower, and Right Side eTower,
•
•
•
•
3) Remove MPB Front Metal Door.
•
4.) Disconnect MPB to BIB Control Cable from the fan cable connector.
8-100
6
EVISION
Table 9-7
.
on page 9-6
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
MPB Front Metal Door Removal Procedure
Figure 8-85 Disconnecting Fan Cable Connector
Section 8-6 - Mechanical Parts- Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
MPB to BIB
Control Cable
M
ERVICE
ANUAL