P R E L I M I N A R Y
D
5771498-100, R
IRECTION
8-5-3
Front End Power Supply (T-FEPS) Replacement Procedure
NOTE:
The Front End Power Supply (T-FEPS) is also referred to as the HVPS (High Voltage Power Supply).
CAUTION
8-5-3-1
Tools
Appropriate Phillips screwdriver.
FRU Part #
Table 9-12
Refer to
8-5-3-2
Time Required
15 minutes
8-5-3-3
Preparation
1.) Shut down the Venue™ ultrasound unit, as described in
2.) Make sure the On/Off power switch is set to Off.
3.) Make sure the system is standing securely on a level surface, with the wheels in the locked position.
8-5-3-4
Front End Power Supply Removal Procedure
1.) Remove all accessories.
•
2.) Remove the following covers: RS Probe Cover, Lower Front eTower, Left side eTower, Right Side
eTower.
•
•
•
•
3.) Open the two fastening latches on the left side of the FE door assembly and carefully open the door.
4) Disconnect the MPB TO T-FEPS Cable.
5.) Loosen the 2 retaining screws that secure the T- FEPS to the Scanner door assembly.
6
EVISION
When performing these procedures, take precautions to avoid damage of
electrostatic-sensitive components. Always have the ESD wrist strap
connected either to the DIB chassis or to the GND plug at the rear of the
scanner, and to your hand.
.
on page 9-12
Accessories - Replacement Procedures
RS Probe Cover Removal Procedure
Lower Front eTower Cover Removal Procedure
Left Side eTower Cover Removal Procedure
Right Side eTower Cover Removal Procedure
Chapter 8 - Replacement Procedures
V
™ S
ENUE
Power Shut Down
.
M
ERVICE
ANUAL
8-71