GE Venue R1 Service Manual page 383

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
6.) Release the J3 peripherals connector
7.) The cable is released.
8-7-12-5
MPB To Peripherals Harness - FRU Cable Installation Procedure
1.) Connect the cable to J3 connector
2.) Route the cable according to the configuration (if printer is used - route the cable upwards)
3.) Connect the cable to the plastic cable clips
4.) Install the MPB module.
5) Install the MPB Front Metal Door.
6.) Install the following covers: Lower Front eTower, Left side eTower, Right Side eTower and RS
Probe cover.
7.) Install all accessories.
8.) Turn ON power to the system.
Perform the checks listed in
6
EVISION
Figure 8-172 Release Cable from J3 Connector
MPB Module Installation Procedure
MPB Front Metal Door Installation Procedure
Left Side eTower Cover Installation Procedure
Right Side eTower Cover Installation Procedure
Lower Front eTower Cover Installation Procedure
Accessories - Replacement Procedures
Chapter 8 - Replacement Procedures
MPB to BIB Control Cable Replacement Procedure
V
™ S
M
ENUE
ERVICE
ANUAL
on page 8-218
8-163

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents