Chapter 2
Site Preparations
Section 2-1

Overview

2-1-1

Purpose of Chapter 2

This chapter provides the information required to plan and prepare for the setup of a Venue™
ultrasound unit. Included are descriptions of the electrical and facility requirements that must be met by
the purchaser. A worksheet is provided at the end of this chapter (see
ensure that all the required network information is available, prior to setup.
6
EVISION
Chapter 2 - Site Preparations
V
™ S
ENUE
ERVICE
Figure 2-3
on page 2-13) to help
M
ANUAL
2-1