Power On/Boot Up; Power Shut Down; Complete Power Down - GE Venue R1 Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
To connect a probe to one of the upper sockets 1, 2, or 3:
1) Hold the probe connector vertically with the cable pointing upward.
2.) Prior to inserting the probe, ensure that the connector locking handle is positioned to the left.
3) Align the connector with the probe port and carefully push into place.
4) Push the connector locking handle to the right to secure the probe connector.
5) Carefully position the probe cord so it is free to move and is not resting on the floor.
To connect a probe to one of the lower socket 4
1) Hold the probe connector vertically with the cable pointing downward.
2.) Prior to inserting the probe, ensure that the connector locking handle is positioned to the right
3) Align the connector with the probe port and carefully push into place.
4) Push the connector locking handle to the left to secure the probe connector.
5) Carefully position the probe cord so it is free to move and is not resting on the floor.
3-5-5-3
Disconnect Probes
Follow these steps to disconnect the RS probes, as applicable:
1) Move the connector locking lever to the left to unlock the connector (For lower socket 4, move the
connector locking lever to the right)
2) Carefully remove the connector from the port.
3) Ensure that the probe head is clean before placing the probe in its storage case.
For cleaning instructions, see the User Manual.
3-5-6

Power on/Boot up

For procedure, see:
3-5-7

Power Shut Down

For procedure, see:
3-5-8

Complete Power Down

For procedure, see:
3-26
6
EVISION
Power ON/Boot-up
Power Shutdown
Complete Power Down
Section 3-5 - Completing the Setup
on page 4 - 3.
on page 4 - 6.
on page 3 -
26.
V
™ S
M
ENUE
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents