System Maintenance; Preliminary Checks - GE Venue R1 Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5771498-100, R
IRECTION
Section 10-5

System Maintenance

10-5-1

Preliminary Checks

The preliminary checks take approximately 15 minutes to perform. Refer to the Venue™ User Manual
whenever necessary.
Table 10-4
Step
1.
2.
3.
4.
5.
6.
7.
8.
10-6
6
EVISION
System Preliminary Checks
Item
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
Paperwork
Fill in the top of the EQC inspection form. Record all probes and Ultrasound system options.
• Turn the Ultrasound system power ON and verify that all fans and peripherals turn On.
• Watch the displays during power up to verify that no warning or error messages are
displayed.
Power-up
• Where applicable, confirm that the battery is charged. If no AC Input present, use the
internal battery.
Probes
Verify that the Ultrasound system properly recognizes all probes.
Displays
Verify proper display on the Monitor and Touch Screen.
Where applicable, Error Logs can be reviewed via system diagnostics.
Review Error Logs
Presets
Back-up all Customer Presets onto appropriate media.
Back up the Image Archive onto appropriate media.
Image Archive
Section 10-3 - Why Do Maintenance?
V
™ S
ENUE
Description
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Venue r2H45051vnH45281vn

Table of Contents