ABB IRB 140 Product Manual page 139

Hide thumbs Also See for IRB 140:
Table of Contents

Advertisement

Equipment
Lifting slings
Locking liquid
Grease
Isopropanol
Standard toolkit
Other tools and pro-
cedures may be re-
quired. See refer-
ences to these proced-
ures in the step-by-
step instructions be-
low.
Removal, base
The procedure below details how to remove the base from the robot.
1
2
3
4
Product manual - IRB 140
3HAC027400-001 Revision: V
Spare part no.
CAUTION
Always cut the paint with a knife and grind the paint edge when disassembling
parts. See
Cut the paint or surface on the robot before replacing parts on page
Action
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
CAUTION
Always cut the paint with a knife and grind the
paint edge when disassembling parts. See
the paint or surface on the robot before repla-
cing parts on page
118.
Remove the axis 1 and 2 motors.
Remove the cable harness.
© Copyright 2004-2018 ABB. All rights reserved.
4.3.4 Replacement of base
Art. no.
Note
-
Loctite 574
For sealing the base to the
gearbox 1-2.
3HAB3537-1
For lubricating the V-ring.
For cleaning the mating
surfaces.
-
Content is defined in sec-
tion
Standard tools on
page
These procedures include
references to the tools re-
quired.
Note
Cut
Detailed in sections:
Replacement of motor, axis 1
on page 177
Replacement of motor, axis 2
on page 181
Detailed in section
cable harness on page
Continues on next page
4 Repair
Continued
239.
118.
Replacement of
120.
139

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents