cover plate.
Unscrew 3 nuts -arrow- from torque
–
converter, rotate crankshaft each time
revolution for this step.
After separating engine and gearbox,
–
secure torque converter in gearbox to
prevent it dropping out.
All vehicles
Hook on the suspension fixture -MP 9-
–
201- as follows and raise slightly with the
workshop crane (e.g. -1202A-).
On the belt pulley side: 1st hole of the
t
perforated bar in position 1
On the flywheel side: 4th hole of the
t
perforated bar in position 5
WARNING
Use securing pins on the hooks and rig
pins.
Secure engine with engine mount -MP 1-
202- to the assembly stand.
Install
Note
t
Always replace the seals and gaskets during assembly work.
t
Always replace self-locking nuts.
Procedure
Installation is performed in the reverse order. Pay attention to the following points:
Check whether the dowel sleeves for centering the engine/gearbox are present in the
–
cylinder block; insert if necessary.
1
/
3
18