Commissioning With Bus Node Cpx-Fb37; Start-Up Behaviour - Festo MSE6-E2M Original Instructions Manual

Energy efficiency module
Table of Contents

Advertisement

4
Commissioning
4.6

Commissioning with bus node CPX-FB37

Detailed information for commissioning the MSE6-E2M with the bus node CPX-FB37 can
be found in the user documentation of the bus node P.BE-CPX-FB37-... (è Tab. 1).
4.7

Start-up behaviour

The desired parameterisation should be carried out in the start-up phase or after network interruptions
by the interface module or the network scanner/bus master, providing this is supported by the network
protocol used. In this way, you can be sure that when the MSE6-E2M has been replaced, the new ter­
minal is operated with the same parameter settings.
The "System start" system parameter (è 7.3 Types of parameters) can be used to influence the start
behaviour. If "System start with default parameterisation and current CPX structure" is set, the desired
parameterisation can then be created in the start-up phase or after network interruptions e.g. by the
interface module or the network scanner/bus master (depending on the network used).
If the "M" LED (Modify) lights up permanently after system start-up, then "System start with saved
parameterisation and current CPX structure" is set.
Warning
When the MSE6-E2M is replaced, a different parameterisation will result in different
behaviour
Injury to persons, damage to the machine and system
If the "M" LED (Modify) is lit continuously, the parameterization of the MSE6-E2M is not
restored automatically by the higher-level controller after a replacement.
• Before replacing the MSE6-E2M, check which settings are required and restore them
after the replacement.
Detailed notes can be found in the description for the appropriate CPX bus node or the
manual for the operator unit.