Faultless Commissioning, Normal Operating Status - Festo MSE6-E2M Original Instructions Manual

Energy efficiency module
Table of Contents

Advertisement

4
Commissioning
Inserting PROFIBUS station ("Station")
1. Drag the station symbol (Festo CPX terminal) from the hardware catalogue onto the bus line of the
PROFIBUS system.
\PROFIBUS\Additional Field Devices\Valves\Festo CPX-Terminal
2. Select PROFIBUS address (station number) corresponding to DIL switch settings on bus node.
3. Insert bus node and module from hardware catalogue:
\PROFIBUS\Additional Field Devices\Valves\Festo CPX-Terminal
• Insert bus node (Slot 1):
– CPX-FB13: DP slave
– CPX-FB13DP slave [Status]
– CPX-FB13: DP slave [DPV1]
• Insert module (Slot 2): E2M-5000 [AI/AO]
Transmiting hardware configuration
• Translate hardware configuration and transmit it to controller.
4.3.6

Faultless commissioning, normal operating status

After faultless commissioning, specific LED indicators on the bus node light up. The other LEDs are for
diagnostics and error handling (è 8 Diagnostics and error handling).
LED indicators
The following LEDs light green:
BF
PS
– PS
– PL
PM
The following LEDs do not light:
– BF
ST
– SF
– M
M
Tab. 4.8 Normal operating status of the MSE6-E2M on bus node CPX-FB13
Festo – MSE6-E2M-SY-EN – 1703d – English
operating status
Normal, no error
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents