Commissioning With Bus Node Cpx-M-Fb37; Commissioning With Bus Nodes Cpx(-M)-Fb43/Fb44; Interfaces And Display Components - Festo MSE6-E2M Operating Instruction

Energy efficiency module
Table of Contents

Advertisement

Commissioning
The M LED lights or flashes if parameterisation has been changed or forcing is active.
8.5

Commissioning with bus node CPX-M-FB37

For detailed information on commissioning with bus node CPX-FB37, see the documentation for the
bus account è 1 Applicable documents.
8.6

Commissioning with bus nodes CPX(-M)-FB43/FB44

This section describes the interfaces, DIL switches and display elements of the bus node mentioned
and provides an overview of the configuration and commissioning with this bus node.
For detailed information on the bus node, see the documentation on the bus account è 1 Applicable
documents.
8.6.1

Interfaces and display components

Interfaces and display components on the bus node CPX-M-FB43 and CPX-M-FB44
Fig. 26: Interfaces and display components on
the bus node e.g. CPX-M-FB44
50
1
2
3
4
5
5
1
Service interface
2
Network-specific and CPX-specific LEDs
3
Memory card, under a cover
4
DIL switch, under a cover
5
Network connection, example CPX-FB44
5
Network connection, example CPX-FB44
Festo — MSE6-E2M — 2022-08d

Advertisement

Table of Contents
loading

Table of Contents