Prior To Commissioning - Festo MSE6-E2M Original Instructions Manual

Energy efficiency module
Table of Contents

Advertisement

4
Commissioning
4.2

Prior to commissioning

Procedure for commissioning preparation:
1. Check pneumatic tubing connection of the MSE6-E2M.
2. Check the electric cables of the MSE6-E2M.
3. Check the DIL switch settings of the MSE6-E2M if required.
The characteristics of the MSE6-E2M can be adapted to various requirements. You can
carry out important settings as follows:
– With the DIL switch directly on the bus node
– With Parameterisation.
The DIL switches and the parameters are preset at the factory.
Information on the DIL switches can be found in the documentation for the bus node
(è Tab. 1). Information on parameterisation can be found in chapter 7.
Caution
Incorrectly set parameters and DIL switches and parameters can cause damage during
operation.
Injury to persons, damage to the machine and system
• Check the parameter and DIL switch settings of the MSE6-E2M before use and re­
placement.
18
Festo – MSE6-E2M-SY-EN – 1703d – English

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents