Chapter 4 Procedure Before The Operation - Mitsubishi Electric MELSEC-Q Series User Manual

Cc-link system master/local module
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

CHAPTER 4
This chapter describes the procedure to be taken before operating a master/local module.
Check column
System planning
Plan the system configuration and device assignment.
Mount the master/local module on the base unit. Connect the slave station
to the control panel and machine.
Connect the modules with a CC-Link dedicated cable. Connect terminating
resistors to the modules located at both ends.
Items to check before
powering on the module
Check the module installation status.
Check the input power supply voltage.
Check that the switch on the CPU module is set to STOP.
Check that the switch on the CPU module is not set to RESET.
Switch setting
Use the switches on the master/local module to set the station number,
transmission speed, and mode.
Set the station number and transmission speed for the slave station as well.
PROCEDURE BEFORE THE
OPERATION
Mounting
Wiring
To the next page

CHAPTER 4 PROCEDURE BEFORE THE OPERATION

Page 41, Section 3.6
Page 75, Section 6.1
Page 76, Section 6.2
Page 21, CHAPTER 2
Page 82, Section 6.3
Page 85, Section 6.4
4
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents