Note: A job file must be loaded onto the printer and selected for building before
build information will be displayed within the Build Status Display. See
a File" on page 41
After pressing the Print button to start a build, "PREPARING" is briefly displayed within the Build Status Display,
and the outer progress ring will fill, in gray, in a clockwise direction. This indicates the amount of time the printer
requires to prepare for the start of the build, including the amount of time required for a Z Zero Calibration to
occur (see
"Z Zero Calibration" on page 156
Once build preparation is complete, "BUILDING" will be displayed within the center of the Build Status Display
along with the amount of time remaining until the build is complete. As build progress is made, the amount of
time remaining will get smaller until zero is reached, indicating that the build is complete. The build's percentage
of completion is also displayed by radially filling in the outer progress ring, in blue, in a clockwise direction.
Figure 4-12:
Touching the screen within the center of the Build Status Display while a part is being built will toggle the
information displayed. After touching the screen the time estimation information will be hidden from view and
instead the Build Status Display will show the number of completed layers as compared to the total number of
layers in the build. Touching the screen again, will toggle back to the time estimation information displayed
initially.
for details.
Build Status Display - Building
for details).
47
"Loading

Advertisement

Table of Contents
loading

This manual is also suitable for:

F270F370

Table of Contents