4. Set the ring supply level indicator [1] behind the tabs on the side of the ring supply cartridge [2].
Test the Breaker Switch
1. If the main machine is on, turn it off.
2. Confirm that the breaker switch [A] is set to the right.
NOTE: The breaker switch is at the bottom of the left rear corner near the power cord. When it is set
to the right, you should see a straight line (-).
3. Connect the power cord to the finisher, then connect the other end to a power supply outlet.
Ring Binder (D392) Installation
2
175