2. Installation
10. Push the ring cartridge in and close its cover.
11. Push the binder unit into the finisher.
12. Close the left front door and right front door.
Prepare the Finisher for Docking
2
1. Attach the ground plate [A] ( x2).
2. Attach the short entrance guide plate [B] ( x2).
3. Remove the tape from the back of the sponge strip [C].
4. Attach the sponge strip to the top edge [D] of the finisher as shown above.
Prepare the Upstream Unit for Docking
The Ring Binder can be docked to one of the following:
• Main machine
• Multi Folder (D454)
• Cover Interposer (B835)
172