Execute Developer Setup
Do this SP after replacing the developer in one or more of the PCUs when servicing the
machine. This SP:
• Checks for the presence of developer in the development unit. This ensures that the
development unit has been filled.
• Initializes TD sensor. (Calibrates Vtcnt).
• Calibrates development gamma and calibrates toner density. Also does the MUSIC
check and correction.
Note: Do SP3811 after drum and cleaning blade replacement. SP3811 should always be
done:
• During the machine installation procedure after the developer and toner have been
installed, and
• During machine maintenance after a drum and cleaning blade have been replaced.
In both cases, SP3811 prevents the blade from scouring a dry drum.
1 All Colors
2 Col
3 K
4 M
5 C
6 Y
7 Dev Auger Time
3802
TD Sn Init OK?
Group 3000
4
269