D1Xx900C To D1Xxc003 Service Processor Power-Off Checkpoints - IBM BladeCenter JS12 Problem Determination And Service Manual

Ibm power6 architecture
Table of Contents

Advertisement

Table 21. D1xx3y01 to D1xx3yF2 checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
D1xx3yF1
D1xx3yF2

D1xx900C to D1xxC003 Service processor power-off checkpoints

These D1xx service processor power-off status codes offer information about the
status of the service processor during a power-off operation.
Table 22 lists the progress codes that might be displayed during the power-on
self-test (POST), along with suggested actions to take if the system hangs on the
progress code. Only when you experience a hang condition should you take any of
the actions described for a progress code.
Table 22. D1xx900C to D1xxC003 checkpoints
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
D1xx900C
D1xxB0FF
140
JS12 Type 7998: Problem Determination and Service Guide
Description
(Command Being Processed)
Memory collection DMA step
Memory collection cleanup
Description
(Command Being Processed)
Breakpoint set in CPU controls has been
hit
Request to initiate power-off program
has been sent
Action
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
Action
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 274.

Advertisement

Table of Contents
loading

Table of Contents